Progress status

House has been commissioned!

100%

Статус

100%

Статус Статус
Статус

The following works are performed:

  • Removal of the existing driveways and passages covering

  • Valuable tree species replanting

  • Removal of the vegetative layer of the soil

  • Digging of foundation ditch

Статус PREPARATORY WORKS

The following works are performed:

  • Removal of the existing driveways and passages covering

  • Valuable tree species replanting

  • Removal of the vegetative layer of the soil

  • Digging of foundation ditch

100%
Статус Статус строительства
Статус

During this stage we immerse the piles, arrange the concrete base, grillage covering and carry out waterproofing works

Статус ARRANGEMENT OF FOUNDATION

During this stage we immerse the piles, arrange the concrete base, grillage covering and carry out waterproofing works

100%
Статус Статус
Статус

During this stage we construct basement, parking, afterwards - erection of vertical construction, foundation of the house

Статус REINFORCED CONCRETE FRAMEWORK

During this stage we construct basement, parking, afterwards - erection of vertical construction, foundation of the house

100%
Статус Статус строительства
Статус

During this stage we carry out laying of internal and external walls, basement walls, parking, erection of partitions.   

Статус MASONRY WORKS

During this stage we carry out laying of internal and external walls, basement walls, parking, erection of partitions.   

100%
Статус Статус
Статус

During this stage we perform the following works:

 

  • Installation of roofs, terraces

  • Ventilation system installation

  • Fire extinguishers and alarm system installation

  • Pumping station installation 

  • Heating system installation

  • Power supply and lighting system installation

  • Installation of elevators 

  • Installation of doors and windows

Статус ROOFING AND INTERIOR WORKS

During this stage we perform the following works:

 

  • Installation of roofs, terraces

  • Ventilation system installation

  • Fire extinguishers and alarm system installation

  • Pumping station installation 

  • Heating system installation

  • Power supply and lighting system installation

  • Installation of elevators 

  • Installation of doors and windows

100%
Статус Статус строительства
Статус

The following works are performed during the stage:

  • Facade cladding, installation of baskets for air conditioners

Finishing of public spaces

Статус FINISHING WORKS

The following works are performed during the stage:

  • Facade cladding, installation of baskets for air conditioners

Finishing of public spaces

100%
Статус Статус
Статус

During this stage we perform the following works:

  • Pavement arrangement

  • Arrangement of playground, public areas 

  • Installation of benches 

  • Territory greening

  • Fence installation

  • Installation of permanent security posts, barriers

Статус LANDSCAPING

During this stage we perform the following works:

  • Pavement arrangement

  • Arrangement of playground, public areas 

  • Installation of benches 

  • Territory greening

  • Fence installation

  • Installation of permanent security posts, barriers

100%
Статус Статус
Статус

Commissioning of the house. Issuing documents and keys to apartments. 

Статус COMMISSIONING

Commissioning of the house. Issuing documents and keys to apartments. 

100%

Construction progress

Cover Июнь 2021, photo

Июнь 2021

Cover Май 2021, photo

Май 2021

Cover Апрель 2021, photo

Апрель 2021

Cover Март 2021, photo

Март 2021

Cover February 2021, photo

February 2021

Cover January 2021, photo

January 2021

Cover December 2021, photo

December 2021

Cover November 2020, photo

November 2020

Cover October 2020, photo

October 2020

Cover September 2020, photo

September 2020

MARINIST doesn’t slow down the construction pace!

Cover August 2020, photo

August 2020

MARINIST 🌊 residence doesn’t slow down the construction pace! ❗️

Cover July 2020, photo

July 2020

By the end of July MARINIST residence construction process has reached the stage when aesthetics are added to the quality✨

Cover June 2020, photo

June 2020

MARINIST construction was hot!

 

In the end of June we have the following news from the construction site:

Cover May 2020, photo

May 2020

Join a construction site tour to choose your future apartment in MARINIST!

Cover April 2020, photo

April 2020

We present a video report from the construction site of MARINIST residence in April 2020.

Cover March 2020, photo

March 2020

MARINIST residence is constructed at our own expense and does not depend on third-party investments even during economic instability. 

 

Therefore, ahead of plans, we:

🔹 pour the floor slabs of the 7th floor in all Sections;

🔹 lay external walls of 4 floors simultaneously (the staff of bricklayers has been doubled!);

🔹 preparatory works for facade finishing are performed! 

Cover February 2020, photo

February 2020

Warm winter made it possible to carry out construction ahead of plans, complying with all technological standards 🏗

Cover January 2020, photo

January 2020

New report from the MARINIST 🌊 residence construction site: Section 1 of the house has been already erected till 6th floor ahead of the rest!

Cover December 2019, photo

December 2019

December in Marinist was spent in the rhythm of intensive work!

Cover November 2019, photo

November 2019

Report of MARINIST construction in November 2019.

 

☝🏻Works completed on installation of diaphragms and topping slabs of Sections: 

🔹Section 1: diaphragms of third floor, topping slabs — diaphragms of forth floor

🔹Section 2 : diaphragms of third floor, topping slabs over the third floor 

🔹Section 3: diaphragms of second floor, topping slabs over the second floor

🔹Section 4: diaphragms of second floor, topping slabs — diaphragms of third floor

🔹Section 5: diaphragms of first floor, topping slabs over the first floor, diaphragms of second floor

Cover October 2019, photo

October 2019

October in Marinist: 

 

The pace of MARINIST construction process during such a warm October is visible on the photos.

Cover September 2019, photo

September 2019

September at Marinist passed in the rhythm of intensive works over the first floor of the complex and parking:

 

Reinforcement of the floor slabs on the first floor of the housing complex and diaphragms of parking have been finished. We follow to the second floor and grow up!

Cover August 2019, photo

August 2019

Over the summer we finished digging the foundation ditch. Now the stage of the building's foundation construction is in full swing. By the beginning of September we will proceed to the first floor!

Cover May 2019, photo

May 2019

Now perennial blue and green spruces form a park in the local area, and will become the main decoration of our project.

Cover Июнь 2021, photo

Июнь 2021

Cover Май 2021, photo

Май 2021

Cover Апрель 2021, photo

Апрель 2021

Cover Март 2021, photo

Март 2021

Cover February 2021, photo

February 2021

Cover January 2021, photo

January 2021

Cover December 2021, photo

December 2021

Cover November 2020, photo

November 2020

Cover October 2020, photo

October 2020

Cover September 2020, photo

September 2020

MARINIST doesn’t slow down the construction pace!

Cover August 2020, photo

August 2020

MARINIST 🌊 residence doesn’t slow down the construction pace! ❗️

Cover July 2020, photo

July 2020

By the end of July MARINIST residence construction process has reached the stage when aesthetics are added to the quality✨

Cover June 2020, photo

June 2020

MARINIST construction was hot!

 

In the end of June we have the following news from the construction site:

Cover May 2020, photo

May 2020

Join a construction site tour to choose your future apartment in MARINIST!

Cover April 2020, photo

April 2020

We present a video report from the construction site of MARINIST residence in April 2020.

Cover March 2020, photo

March 2020

MARINIST residence is constructed at our own expense and does not depend on third-party investments even during economic instability. 

 

Therefore, ahead of plans, we:

🔹 pour the floor slabs of the 7th floor in all Sections;

🔹 lay external walls of 4 floors simultaneously (the staff of bricklayers has been doubled!);

🔹 preparatory works for facade finishing are performed! 

Cover February 2020, photo

February 2020

Warm winter made it possible to carry out construction ahead of plans, complying with all technological standards 🏗

Cover January 2020, photo

January 2020

New report from the MARINIST 🌊 residence construction site: Section 1 of the house has been already erected till 6th floor ahead of the rest!

Cover December 2019, photo

December 2019

December in Marinist was spent in the rhythm of intensive work!

Cover November 2019, photo

November 2019

Report of MARINIST construction in November 2019.

 

☝🏻Works completed on installation of diaphragms and topping slabs of Sections: 

🔹Section 1: diaphragms of third floor, topping slabs — diaphragms of forth floor

🔹Section 2 : diaphragms of third floor, topping slabs over the third floor 

🔹Section 3: diaphragms of second floor, topping slabs over the second floor

🔹Section 4: diaphragms of second floor, topping slabs — diaphragms of third floor

🔹Section 5: diaphragms of first floor, topping slabs over the first floor, diaphragms of second floor

Cover October 2019, photo

October 2019

October in Marinist: 

 

The pace of MARINIST construction process during such a warm October is visible on the photos.

Cover September 2019, photo

September 2019

September at Marinist passed in the rhythm of intensive works over the first floor of the complex and parking:

 

Reinforcement of the floor slabs on the first floor of the housing complex and diaphragms of parking have been finished. We follow to the second floor and grow up!

Cover August 2019, photo

August 2019

Over the summer we finished digging the foundation ditch. Now the stage of the building's foundation construction is in full swing. By the beginning of September we will proceed to the first floor!

Cover May 2019, photo

May 2019

Now perennial blue and green spruces form a park in the local area, and will become the main decoration of our project.

ТОВ "Маячный"